10-0706-2,Long lead thermistor 1306/1300/606 PA
Eyelet with thermistor and long wire lead.
Original: $10.00
$10.00
Product Information
Shipping & Returns
DC-35, DC POWER STRIP, HI-CURRENT, 35 AMPS, METER
$139.95
DL-650M, IT, DUMMY LOAD, 1500W, 0-650 MHz
$41.98
DL-650MN, IT, DUMMY LOAD, 1500W, 0-650 MHz, N
$149.95
$44.98
DL-300MN, IT, DRY DUMMY LOAD, 300W, 0-150MHz, N
$84.95
$25.48
DL-2500N, IT,DUMMY LOAD, 2500W, 0-150MHz, FAN COOLED, N
$309.95
$92.98
DL-300M, IT, DRY DUMMY LOAD, 300W, 0-150MHz
$74.95
$22.48
DL-2500, IT, DUMMY LOAD, 2500W, 0-150MHz, FAN COOLED
$299.95
$89.98
VEC-101KC, KIT CASE, SHORTWAVE CONVERTER
$29.95
$8.98
VC-300D, HF TUNER, 300W, BAR GRAPH, SWR/WATTMETER, DL
VC-300DLP, HF TUNER, 300W, SWR/WATTMETER, DL
$289.95
$86.98
VEC-101K, KIT, SHORTWAVE CONVERTER
$39.95
$11.99
VC-300M, HF MOBILE TUNER, 300W, SWR/WATTMETER
$199.95
$59.98